Progress report

construction snapshot
Downstairs. Stairs up to the Main Level are behind the plastic sheeting.

The expansion project continues over the break, and this week is an especially noisy one. Remember that wall of shelves on the lower level that used to greet you at the bottom of the stairs? It’s gone now!

In addition to bringing down entire walls, crews are working on lights, installing shelving, and prepping the floor this week.

If you plan to use the Library over the break, please remember that we have earplugs at the desk.