The filament current was zero when the high voltage is applied. Trouble shooting is undergoing now. Please do not used till further notice.
Month: July 2019
JEOL 2800 is being serviced from 7/8/19 to 7/11/19 (till 6pm)
JEOL 2800 is getting a Nanomegas system. JEOL engineers are installing some hardware on the scope for the preparation. Also, they are going to fix the ACD tank and replace the dirty hard x ray aperture.