2800 vacuum service started Monday 9/28/20 and brought up 3:30PM on 10/2/20

2800’s scroll pumps were replaced and the one of the TMP controllers got replaced as well.

The potentiometer on the vacuum board was properly adjusted to display vacuum accurately. Now the vacuum looks good. Since we opened the evacuation line, we started a bake on 9/30/20 (1pm). The bakeout will be done Friday.