The dual-beam instrument has a vacuum gauge problem today. Engineer will be on campus tomorrow.
One Reply to “FEI Quanta 3D up on 1/25/2011”
Leave a Reply
You must be logged in to post a comment.
Current news from IMRI facilities
The dual-beam instrument has a vacuum gauge problem today. Engineer will be on campus tomorrow.
You must be logged in to post a comment.
Vacuum propblem was fixed yesterday. vCD detector is working, OK for basic SEM and FIB.
Need a new Pt GIS source. Beam deceleration needs more service