One Reply to “MC2 XL-30 SEM down- Jan 30-Feb1 (power board) and Feb 3-8 (changing FEG emitter)”

  1. After the power borad problem was solved, FEI engineer spent 5 days to replace the old emitter with a new one

Leave a Reply