One Reply to “Magellan Down on 4/11/14 and Ok to Use on 4/14/14”

  1. Neither of the FEI engineers were available today. The engineer is suppose to be available tomorrow to assess the pole piece. However, the imaging capability of the Magellan still appears to be normal and users may use the Magellan and quickloader in the mean time.

Leave a Reply