2100 is operational at 1/13/2020lxing3 / January 21, 2020 / Instrument Status 2100 is operational temporarily with FEG running at high temperature. A new gun is ordered. Share this post: Share on X (Twitter) Share on Facebook Share on LinkedIn Share on Email