2100F is operational at 3/16/2020lxing3 / March 16, 2020March 16, 2020 / Instrument Status The gun replacement is done and the scope is back to operational at 3pm, 3/16/2020 Share this post: Share on X (Twitter) Share on Facebook Share on LinkedIn Share on Email