The temperature control board is broken so the OneView CCD can not be cool down. Gatan replaced the board on Monday 11/9/2020 and 2100F is back to operation at 1pm.
Total done time 228 hours (12 days).
Current news from IMRI facilities
The temperature control board is broken so the OneView CCD can not be cool down. Gatan replaced the board on Monday 11/9/2020 and 2100F is back to operation at 1pm.
Total done time 228 hours (12 days).