The Pt/Pd target is run out and ACE200 is not available for sputtering from 10/13/2020. This does not affect both carbon coating and glow discharge. We already ordered the replacement from Leica and will let you know once sputtering is available.
One Reply to “Sputtering is not available at ACE200 and recovered on 10/23/20”
Leave a Reply
You must be logged in to post a comment.
The Pt/Pd target is replaced and ACE200 is operational as usual 10/23/20.