2100 was down due to campus wide power outage at 8:30pm 10/4/21 and became opetional at 1:30pm 10/5/21.
Author: lxing3
OneView CCD on 2100F is done from 10/28/2020 to 11/9/2020
The temperature control board is broken so the OneView CCD can not be cool down. Gatan replaced the board on Monday 11/9/2020 and 2100F is back to operation at 1pm.
Total done time 228 hours (12 days).
Sputtering is not available at ACE200 and recovered on 10/23/20
The Pt/Pd target is run out and ACE200 is not available for sputtering from 10/13/2020. This does not affect both carbon coating and glow discharge. We already ordered the replacement from Leica and will let you know once sputtering is available.
2100F is operational at 3/16/2020
The gun replacement is done and the scope is back to operational at 3pm, 3/16/2020
2100 down for gun replacement from 2/24/2020
2100F is down for gun replacement since 2/24/2020
2100 is operational at 1/13/2020
2100 is operational temporarily with FEG running at high temperature. A new gun is ordered.
2800 is down
2800 is down and the JEOL engineer is working on diagnosis.
2100F is down due to gun problem.
The gun appears dead and we are working with JEOL to get a replacement as soon as possible.
GrandARM is down on 9/26/2018 and up on 9/27/2018
2100F OneView camera is down on 6/27/2018 and up on 7/16/2018
Gatan service is called and troubleshooting is on the way. We willl inform you once the camera is up operational.