2800 vacuum service started Monday 9/28/20 and brought up 3:30PM on 10/2/20

2800’s scroll pumps were replaced and the one of the TMP controllers got replaced as well.

The potentiometer on the vacuum board was properly adjusted to display vacuum accurately. Now the vacuum looks good. Since we opened the evacuation line, we started a bake on 9/30/20 (1pm). The bakeout will be done Friday.

Grand ARM was down from 9am-5pm on 2/4 and 9am-5pm on 2/6, now operatioal

One of the Grand ARM’s rotary pump is leaking and needed to be replaced and the water chiller pump was also leaking. We put the scope in sleep and then JEOL is going to replace the bad rotary pump as well as the leaky water chiller pump today. We expect this service will be done by the end of today.